News

Aera Group on-ground for the 2nd verification audit of Toujounine solar PV plant & Nouakchott wind farm.
ADVISORY | Aera Group on-ground for the 2nd verification audit of Toujounine solar PV plant & Nouakchott wind farm.
12.19.19

Aera Group on-ground for the 2nd verification audit of Toujounine solar PV plant (50 MW) & Nouakchott wind farm (30 MW). More than 120,000 tCO2  have been avoided in the last 14 months.